First assignment is a fact for Prismace Consultancy

Published on 1 March 2019 at 11:54

As of March 2019, Prismace Consultancy will start working for the joint venture Ballast-Nedam / T A V Construction. In this role Prismace Consultancy is responsible for environment, Safety, Security and Health within the project group.

Hereunder the links to the joint venture partner websites regarding this prestigious project.

 

http://tavconstruction.com/aviation-projects

https://www.ballast-nedam.com/projects/airside-pier-schiphol/

 

Amsterdam Airport Schiphol is the main international airport of the Netherlands and the hub of Royal Dutch Airlines (KLM). Located 9 kilometres southwest of Amsterdam, 63.7 million passengers were served at Schiphol in 2017, making it the third busiest airport in Europe after London-Heathrow and Paris-Charles de Gaulle. In order to address future capacity requirements with the projected increase in the traffic volume and to strengthen its leading position further as a global hub, Royal Schiphol Group, the state-owned operator embarked on a multi-phased development program called the Schiphol Capital Programme. One of the primary components of this expansion program is the New Pier A which will eventually be connected to the next phase, the new 100,000 square meters Terminal Building which will be built by 2023.

 

For Dutch standards, this is an extremely large project. In total there is 53,000 m2 of room, divided over three floors, which allows travellers with different security statuses to be separated. Also, it includes a total of eight gates and 57,000 m2 of paving to create a parking site for aircrafts.


«   »

Add comment

Comments

There are no comments yet.